New study suggests Atlantic Loop needed as part of energy mix as coal is phased out

New study suggests Atlantic Loop needed as part of energy mix as coal is phased out

The construction site of the hydroelectric facility at Muskrat Falls, Newfoundland and Labrador is seen on Tuesday, July 14, 2015. (THE CANADIAN PRESS/Andrew Vaughan) The construction site of the hydroelectric facility at Muskrat Falls, Newfoundland and Labrador is seen on Tuesday, July 14, 2015. (THE CANADIAN PRESS/Andrew Vaughan)

CTVNews.ca Top Stories

How to avoid luggage headaches amid air travel chaos

Travellers might not have any control over long lines and cancelled flights, but there are ways to minimize luggage disasters. From tracking devices for your luggage to packing light, here are some tips and tricks for your next trip through the airport.